INSTALLATION GUIDEPRO 48 Refrigeration
PRO 48 Installation 10Unpack the UnitUncrate the PRO 48 unit and inspect for any damages.Remove the wood base and discard the shipping boltsand bracke
Use an appliance dolly to move the unit near the roughopening. The PRO 48 is equipped with rollers, so it can bemoved into position more easily.When s
Water Line ConnectionApproximately 3' (.9 m) of1/4" plastic tubing is connectedto the ice maker with a preassembled1/4" compressionconn
PRO 48 Installation 13subzero.com/specsIMPORTANT NOTE: When adjusting hinges, it is importantto keep hinges parallel to the face of the door and side
PRO 48 Installation 14Drawer AdjustmentMake sure all drawers of the PRO 48 are properly alignedfor function and appearance. If not, vertical and horiz
PRO 48 Installation 15subzero.com/specsKICKPLATEKickplate installation.Complete the InstallationINSTALL KICKPLATEMake sure the drain pan is in the pro
PRO 48 Installation 16Water Filtration SystemWATER FILTER BYPASS MODEIf you choose not to use the water filtration system, thesystem can be placed in
PRO 48 Installation 17subzero.com/specsInstallation ChecklistTo ensure a safe and proper installation, the followingchecklist should be completed by t
Service Information 18Service InformationIf service is necessary, maintain the quality built into yourPRO 48 unit by calling Sub-Zero factory certifie
The information and images in this guide are the copyright property of Sub-Zero, Inc. Neither this guide nor any information or images contained herei
Important NoteTo ensure the safe and efficient installation of Sub-Zeroequipment, please take note of the following types ofhighlighted information th
SUB-ZERO, INC. P. O. BOX 44848 MADISON, WI 53744 SUBZERO.COM 800.222.78207020379 REV-A 10 / 2010
PRO 48 Refrigeration 3subzero.com/specsSub-Zero PRO 48 RefrigerationThe importance of the installation of the Sub-ZeroPRO 48 unit cannot be overemphas
PRO 48 Specifications 448" (1219)84"(2134)257/8" (657)303/16" (767)4" (10 2)301/2"(775)237/8"(606)421/8"(1070)
PRO 48 Site Preparation 5subzero.com/specsOPENINGDEPTHFRONT VIEWSIDE VIEWTOP VIEWOPENINGWIDTHOPENINGDEPTHOPENINGHEIGHTIMPORTANT NOTE: For standard bui
PRO 48 Site Preparation 6Electrical RequirementsPower Supply 115 V AC, 60 HzCircuit Breaker 15 ampReceptacle 3-prong grounding-typeDo not use an exten
PRO 48 Site Preparation 7subzero.com/specsPlumbing RequirementsThe PRO 48 has an automatic ice maker with an integratedwater filtration system. The wa
PRO 48 Installation 8IMPORTANT NOTE: For either wood or concrete floorapplications, if the wood screws do not hit a wall stud inany of the upper holes
PRO 48 Installation 9subzero.com/specsAnti-Tip Bracket InstallationWOOD FLOOR APPLICATIONSUse the twelve #12 x 21/2" wood screws and the twelve#1
Commenti su questo manuale